Recent Posts

Opposition grows to MN lege end run on power plant

by Dan Burns on January 23, 2017

desertPerhaps they’re feeling pretty full of themselves after Trump’s “win,” (and the disgraceful coattails thereof in Minnesota), or perhaps they would have tried this anyway. In any case, it’s interesting to see who all is lining up against it.
 

A group of large industrial users joined consumer advocates in decrying a bill that would permit Xcel Energy to build a 786 megawatt combined cycle natural gas plant without regulatory approval.
 
The gas plant, likely to cost more than $1 billion, would replace two coal-fired units at Xcel plant near the town of Becker that are slated for closure by 2026.
 
Sponsored by Republican Rep. Jim Newberger, whose district includes Becker, the bill was approved by the Job Growth and Energy Affordability Policy and Finance committee (January 17). A companion bill will be heard in the Senate.
 
Leading opposition to the decision are the Minnesota Large Industrial Group and the Citizens Utility Board, as well as several clean energy groups. A letter signed by dozens of church leaders also voiced objection to the legislation.
(Midwest Energy News)

Comments on this entry are closed.

Previous post:

Next post: